Key takeaways
- For design-bid-build contracts, and amendments, entered into on or after Jan 1, 2027 directly between a public entity and an architect or engineer, retention may not exceed 5 percent, and any retention must be released no later than 60 days after the services under the contract are complete.
- A higher rate is allowed only on a specific project where, among other conditions, a finding has been made that the project is substantially complex and needs more retention.
- The bill defines terms including public entity.
SB 1205 — Ch. 424, Stats. 2026. This guide is written for California local government staff and distinguishes the law's direct requirements from source commentary and possible local implications.
At a glance
| Bill and chapter | SB 1205 · Ch. 424, Stats. 2026 |
|---|---|
| Subject area | Transportation, Public Works & Contracting |
| Local impact | Limits or preempts local authority |
| Action class | Code and operational |
| Workbook priority | 3.0 (scale: 5 highest) |
| Effective date | Jan 1, 2027 |
| Who is affected | Public entities as defined in the bill, including cities and counties that contract directly with architecture or engineering firms |
What the measure changes
For design-bid-build contracts, and amendments, entered into on or after Jan 1, 2027 directly between a public entity and an architect or engineer, retention may not exceed 5 percent, and any retention must be released no later than 60 days after the services under the contract are complete. A higher rate is allowed only on a specific project where, among other conditions, a finding has been made that the project is substantially complex and needs more retention. The bill defines terms including public entity.
The chaptered bill text controls; the Legislative Counsel’s Digest is a summary of the statute. This article translates the workbook’s findings into an implementation-focused overview and does not replace the statute or jurisdiction-specific legal advice.
Who this matters to in city or county government
Covered entities and scope: Public entities as defined in the bill, including cities and counties that contract directly with architecture or engineering firms
Population or other scope limit: Design-bid-build contracts with architecture or engineering firms entered into or amended on or after Jan 1, 2027
Departments and roles identified in the workbook:
- Purchasing/Contracts
- Public Works/Engineering
- City/County Attorney
- City Council/Board
- Finance/Treasury/Tax
Charter-city note: Not stated
What local governments need to know
Update standard architecture and engineering agreements and purchasing policies for design-bid-build contracts and amendments entered into on or after Jan 1, 2027 to cap retention at 5 percent and release it within 60 days after the firm's services are complete; a higher rate is allowed only for a project where a finding of substantial complexity has been made, subject to the other conditions in the statute.
Code or governing-body change: If the purchasing ordinance or a council-adopted contracting policy sets retention on architecture or engineering contracts above 5 percent or a later release, amend it to the 5 percent cap and 60 day release for design-bid-build contracts and amendments made on or after Jan 1, 2027.
Operational change: Purchasing and public works update standard architecture and engineering agreements and payment practice to cap retention and release it within 60 days of completed services, using a higher rate only where the statutory complexity finding and other conditions are met.
Code review: Possibly
Potentially affected code or policy areas: Purchasing; Professional services contract templates; Public works contracting policies
Preemption or local authority: Yes
New local requirement: Yes
Implementation roadmap
- Confirm the agency is covered: Public entities as defined in the bill, including cities and counties that contract directly with architecture or engineering firms Scope limits: Design-bid-build contracts with architecture or engineering firms entered into or amended on or after Jan 1, 2027
- Assign a lead and supporting roles from the affected departments: Purchasing/Contracts, Public Works/Engineering, City/County Attorney, City Council/Board, Finance/Treasury/Tax.
- Review the relevant code, ordinance, plan, fee schedule, or governing-body policy: If the purchasing ordinance or a council-adopted contracting policy sets retention on architecture or engineering contracts above 5 percent or a later release, amend it to the 5 percent cap and 60 day release for design-bid-build contracts and amendments made on or after Jan 1, 2027.
- Update staff workflow, forms, notices, contracting, reporting, or training as applicable: Purchasing and public works update standard architecture and engineering agreements and payment practice to cap retention and release it within 60 days of completed services, using a higher rate only where the statutory complexity finding and other conditions are met.
- Calendar and verify the applicable dates: Jan 1, 2027
Key dates and deadlines
- General effective date and deadlines: Jan 1, 2027
Implementation and compliance considerations
| Implementation area | Review | What staff should verify |
|---|---|---|
| Local impact classification | Limits or preempts local authority | Workbook action class: Code and operational. |
| Scope and coverage | Confirm | Design-bid-build contracts with architecture or engineering firms entered into or amended on or after Jan 1, 2027 |
| Effective dates | Calendar | Jan 1, 2027 |
Enforcement and reimbursement
None stated; Local Program: NO
Issues to confirm with agency counsel
The digest says the exception requires a substantial-complexity finding 'among other things'; read the chaptered text for the full conditions and for how 'public entity' is defined, including whether charter cities and counties are covered. Digest key shows no state-mandated local program.
Sources and provenance
This overview organizes findings supplied in the California 2026 localities workbook. Source links and commentary were carried over from that workbook; they have not been independently verified for this article. Association and law-firm summaries are secondary commentary, not controlling law. Consult the official text before relying on an interpretation.
- California Legislative Information — chaptered bill text and digestOfficial
- Governor of California (gov.ca.gov)Official · 2026-09-20
Public contracts: retention on architecture or engineering services.
Frequently asked questions
What does SB 1205 do?
For design-bid-build contracts, and amendments, entered into on or after Jan 1, 2027 directly between a public entity and an architect or engineer, retention may not exceed 5 percent, and any retention must be released no later than 60 days after the services under the contract are complete. A higher rate is allowed only on a specific project where, among other conditions, a finding has been made that the project is substantially complex and needs more retention. The bill defines terms including public entity.
Which local agencies or staff are affected?
Public entities as defined in the bill, including cities and counties that contract directly with architecture or engineering firms
What should local government staff do next?
Update standard architecture and engineering agreements and purchasing policies for design-bid-build contracts and amendments entered into on or after Jan 1, 2027 to cap retention at 5 percent and release it within 60 days after the firm's services are complete; a higher rate is allowed only for a project where a finding of substantial complexity has been made, subject to the other conditions in the statute.
Prepared as an informational guide for local government professionals. Confirm statutory requirements, local applicability, and current law with qualified agency counsel.
Published by Legislaide Editorial Team. Workbook-based legislative overview. Sources, review, and corrections policy. Source reference record (JSON).