AB 40: California Environmental Quality Act: environmental impact reports: coal handling, storage, and export — California Local Government Guide

Bill: AB 40Effective: Jan 1, 2027 (general effective date for non-urgency statutes

Before the first discretionary approval of a large-volume bulk coal facility (design capacity above 5,000,000 short tons per year), the lead agency must prepare an EIR. Lead agencies and air districts cannot rely on an existing EIR, and a subsequent or new EIR is needed if capacity grows past the threshold, the coal type changes or was not addressed, or the quantity rises significantly or was not disclosed. The EIR must evaluate fugitive dust (PM2.5 and PM10) and require mitigation. The rule reaches approvals pending or made after June 4, 2026.

CaliforniaLocal GovernmentAB 40Environmental Quality (Water, Energy, Waste, Climate)2026 California Law

Key takeaways

  • Before the first discretionary approval of a large-volume bulk coal facility (design capacity above 5,000,000 short tons per year), the lead agency must prepare an EIR.
  • Lead agencies and air districts cannot rely on an existing EIR, and a subsequent or new EIR is needed if capacity grows past the threshold, the coal type changes or was not addressed, or the quantity rises significantly or was not disclosed.
  • The EIR must evaluate fugitive dust (PM2.5 and PM10) and require mitigation.
  • The rule reaches approvals pending or made after June 4, 2026.

AB 40 — Ch. 864, Stats. 2026. This guide is written for California local government staff and distinguishes the law's direct requirements from source commentary and possible local implications.

At a glance

Bill and chapterAB 40 · Ch. 864, Stats. 2026
Subject areaEnvironmental Quality (Water, Energy, Waste, Climate)
Local impactRequired: administrative action
Action classOperational only
Workbook priority2.0 (scale: 5 highest)
Effective dateJan 1, 2027 (general effective date for non-urgency statutes; chaptered 9/30/2026); applies to discretionary approvals pending or made after June 4, 2026
Who is affectedLead agencies and air districts reviewing large-volume bulk coal facilities (over 5,000,000 short tons per year); in practice a few port and industrial jurisdictions

What the measure changes

Before the first discretionary approval of a large-volume bulk coal facility (design capacity above 5,000,000 short tons per year), the lead agency must prepare an EIR. Lead agencies and air districts cannot rely on an existing EIR, and a subsequent or new EIR is needed if capacity grows past the threshold, the coal type changes or was not addressed, or the quantity rises significantly or was not disclosed. The EIR must evaluate fugitive dust (PM2.5 and PM10) and require mitigation. The rule reaches approvals pending or made after June 4, 2026.

The chaptered bill text controls; the Legislative Counsel’s Digest is a summary of the statute. This article translates the workbook’s findings into an implementation-focused overview and does not replace the statute or jurisdiction-specific legal advice.

Who this matters to in city or county government

Covered entities and scope: Lead agencies and air districts reviewing large-volume bulk coal facilities (over 5,000,000 short tons per year); in practice a few port and industrial jurisdictions

Population or other scope limit: Facilities with design capacity above 5,000,000 short tons per year of coal

Departments and roles identified in the workbook:

  • Planning/Zoning
  • City/County Attorney
  • Economic Development
  • Utilities (Water/Wastewater/Solid Waste/Energy)

Charter-city note: Not stated

What local governments need to know

Lead agencies (and air districts) with an approval for a facility above 5,000,000 short tons per year of coal handling, storage or export prepare an EIR before the first discretionary approval, do not rely on an existing EIR in the listed cases, and ensure the EIR evaluates fugitive PM2.5 and PM10 dust and requires mitigation.

Operational change: Planning staff acting as CEQA lead agency prepare a full EIR, with fugitive PM2.5 and PM10 dust analysis and mitigation, before the first discretionary approval of a large bulk coal facility, and stop relying on prior EIRs in the listed cases, including approvals pending after June 4, 2026.

Code review: No

Potentially affected code or policy areas: CEQA procedures; Industrial land use approvals; Port and terminal permitting

Preemption or local authority: Yes

New local requirement: Yes

Implementation roadmap

  1. Confirm the agency is covered: Lead agencies and air districts reviewing large-volume bulk coal facilities (over 5,000,000 short tons per year); in practice a few port and industrial jurisdictions Scope limits: Facilities with design capacity above 5,000,000 short tons per year of coal
  2. Assign a lead and supporting roles from the affected departments: Planning/Zoning, City/County Attorney, Economic Development, Utilities (Water/Wastewater/Solid Waste/Energy).
  3. Update staff workflow, forms, notices, contracting, reporting, or training as applicable: Planning staff acting as CEQA lead agency prepare a full EIR, with fugitive PM2.5 and PM10 dust analysis and mitigation, before the first discretionary approval of a large bulk coal facility, and stop relying on prior EIRs in the listed cases, including approvals pending after June 4, 2026.
  4. Calendar and verify the applicable dates: Jan 1, 2027 (general effective date for non-urgency statutes; chaptered 9/30/2026); applies to discretionary approvals pending or made after June 4, 2026

Key dates and deadlines

  • General effective date and deadlines: Jan 1, 2027 (general effective date for non-urgency statutes; chaptered 9/30/2026); applies to discretionary approvals pending or made after June 4, 2026
  • Code change deadline: Not applicable

Implementation and compliance considerations

Implementation areaReviewWhat staff should verify
Local impact classificationRequired: administrative actionWorkbook action class: Operational only.
Scope and coverageConfirmFacilities with design capacity above 5,000,000 short tons per year of coal
Effective datesCalendarJan 1, 2027 (general effective date for non-urgency statutes; chaptered 9/30/2026); applies to discretionary approvals pending or made after June 4, 2026

Enforcement and reimbursement

Digest flags a state-mandated local program for the new lead agency duties, with no reimbursement required for a specified reason; CEQA's existing review process applies

Issues to confirm with agency counsel

Gut-and-amend: earlier versions of AB 40 reportedly covered a different subject; labels follow the chaptered digest. Check any pending or recent coal terminal approvals against the June 4, 2026 reach-back. Digest does not address charter cities.

Source guidance for local agencies

The Governor's office listed the bill by headline only. Earthjustice and press coverage tie it to the proposed Oakland West Gateway Terminal and say a full EIR is required before any public agency approval.

Sources and provenance

This overview organizes findings supplied in the California 2026 localities workbook. Source links and commentary were carried over from that workbook; they have not been independently verified for this article. Association and law-firm summaries are secondary commentary, not controlling law. Consult the official text before relying on an interpretation.

Frequently asked questions

What does AB 40 do?

Before the first discretionary approval of a large-volume bulk coal facility (design capacity above 5,000,000 short tons per year), the lead agency must prepare an EIR. Lead agencies and air districts cannot rely on an existing EIR, and a subsequent or new EIR is needed if capacity grows past the threshold, the coal type changes or was not addressed, or the quantity rises significantly or was not disclosed. The EIR must evaluate fugitive dust (PM2.5 and PM10) and require mitigation. The rule reaches approvals pending or made after June 4, 2026.

Which local agencies or staff are affected?

Lead agencies and air districts reviewing large-volume bulk coal facilities (over 5,000,000 short tons per year); in practice a few port and industrial jurisdictions

What should local government staff do next?

Lead agencies (and air districts) with an approval for a facility above 5,000,000 short tons per year of coal handling, storage or export prepare an EIR before the first discretionary approval, do not rely on an existing EIR in the listed cases, and ensure the EIR evaluates fugitive PM2.5 and PM10 dust and requires mitigation.

Prepared as an informational guide for local government professionals. Confirm statutory requirements, local applicability, and current law with qualified agency counsel.