Key takeaways
- Creates the FOREST program, run by the State Board of Forestry and Fire Protection, to pay an incentive rate for electricity generated from forest biomass waste and sold to specified retail sellers, and creates a FOREST and Wildfire Prevention Fund, all subject to appropriation.
- Facilities must draw at least 60 percent of feedstock from Tier 1 and Tier 2 high hazard zones, be located in specified counties or meet emission limits, and hold Energy Commission renewable certification.
- The Timber Regulation and Forest Restoration Fund can support the program, and Public Resources Code 4629.6 and 4629.8 changes are contingent on AB 2494.
AB 706 — Ch. 869, Stats. 2026. This guide is written for California local government staff and distinguishes the law's direct requirements from source commentary and possible local implications.
At a glance
| Bill and chapter | AB 706 · Ch. 869, Stats. 2026 |
|---|---|
| Subject area | Environmental Quality (Water, Energy, Waste, Climate) |
| Local impact | Informational or monitoring |
| Action class | None |
| Workbook priority | 1.0 (scale: 5 highest) |
| Effective date | Jan 1, 2027 (general effective date for non-urgency statutes; chaptered 9/30/2026); funding only upon appropriation |
| Who is affected | Biomass power facilities meeting the location or emission criteria; retail sellers of electricity that buy the power (which may include publicly owned utilities and community choice aggregators); no direct city or county duty |
What the measure changes
Creates the FOREST program, run by the State Board of Forestry and Fire Protection, to pay an incentive rate for electricity generated from forest biomass waste and sold to specified retail sellers, and creates a FOREST and Wildfire Prevention Fund, all subject to appropriation. Facilities must draw at least 60 percent of feedstock from Tier 1 and Tier 2 high hazard zones, be located in specified counties or meet emission limits, and hold Energy Commission renewable certification. The Timber Regulation and Forest Restoration Fund can support the program, and Public Resources Code 4629.6 and 4629.8 changes are contingent on AB 2494.
The chaptered bill text controls; the Legislative Counsel’s Digest is a summary of the statute. This article translates the workbook’s findings into an implementation-focused overview and does not replace the statute or jurisdiction-specific legal advice.
Who this matters to in city or county government
Covered entities and scope: Biomass power facilities meeting the location or emission criteria; retail sellers of electricity that buy the power (which may include publicly owned utilities and community choice aggregators); no direct city or county duty
Population or other scope limit: Facilities in specified counties or meeting specified emission limits, with at least 60 percent of feedstock from Tier 1 and Tier 2 high hazard zones
Departments and roles identified in the workbook:
- Utilities (Water/Wastewater/Solid Waste/Energy)
- Fire/EMS
- Economic Development
Charter-city note: N/A
What local governments need to know
Mandatory local action: The workbook does not identify a new required city or county action. No local action; municipal utilities, community choice aggregators and rural counties that buy or host biomass power note the new state FOREST program and fund, which operate only upon legislative appropriation.
Code review: No
Potentially affected code or policy areas: None
Preemption or local authority: No
New local requirement: No
Implementation roadmap
- Determine whether the agency is within the law's scope: Biomass power facilities meeting the location or emission criteria; retail sellers of electricity that buy the power (which may include publicly owned utilities and community choice aggregators); no direct city or county duty
- Decide whether any optional authority, funding, revenue, or operational opportunity is relevant to local policy.
- Check existing code and procedures for a conflict or an implementation opportunity before changing local practice.
- Calendar relevant dates and monitor state guidance: Jan 1, 2027 (general effective date for non-urgency statutes; chaptered 9/30/2026); funding only upon appropriation
Key dates and deadlines
- General effective date and deadlines: Jan 1, 2027 (general effective date for non-urgency statutes; chaptered 9/30/2026); funding only upon appropriation
Implementation and compliance considerations
| Implementation area | Review | What staff should verify |
|---|---|---|
| Local impact classification | Informational or monitoring | Workbook action class: None. |
| Scope and coverage | Confirm | Facilities in specified counties or meeting specified emission limits, with at least 60 percent of feedstock from Tier 1 and Tier 2 high hazard zones |
| Effective dates | Calendar | Jan 1, 2027 (general effective date for non-urgency statutes; chaptered 9/30/2026); funding only upon appropriation |
Enforcement and reimbursement
None stated
Issues to confirm with agency counsel
Chaptered digest read; Local Program: No. Double-jointed with AB 2494 on Public Resources Code 4629.6 and 4629.8 (operative only if both enacted and this bill enacted last).
Source guidance for local agencies
The Governor's office announced the signing; KP Public Affairs notes the program is authorized upon appropriation. No local guidance.
Sources and provenance
This overview organizes findings supplied in the California 2026 localities workbook. Source links and commentary were carried over from that workbook; they have not been independently verified for this article. Association and law-firm summaries are secondary commentary, not controlling law. Consult the official text before relying on an interpretation.
- California Legislative Information — chaptered bill text and digestOfficial
- Governor of California (gov.ca.gov)Official · 2026-09-30
FOREST and Wildfire Prevention Fund Act (biomass). - KP Public AffairsPolicy/news · 2026-10-02
Forest biomass FOREST program authorized upon appropriation.
Frequently asked questions
What does AB 706 do?
Creates the FOREST program, run by the State Board of Forestry and Fire Protection, to pay an incentive rate for electricity generated from forest biomass waste and sold to specified retail sellers, and creates a FOREST and Wildfire Prevention Fund, all subject to appropriation. Facilities must draw at least 60 percent of feedstock from Tier 1 and Tier 2 high hazard zones, be located in specified counties or meet emission limits, and hold Energy Commission renewable certification. The Timber Regulation and Forest Restoration Fund can support the program, and Public Resources Code 4629.6 and 4629.8 changes are contingent on AB 2494.
Which local agencies or staff are affected?
Biomass power facilities meeting the location or emission criteria; retail sellers of electricity that buy the power (which may include publicly owned utilities and community choice aggregators); no direct city or county duty
What should local government staff do next?
Review whether optional authority or indirect impacts are relevant, and confirm the chaptered text.
Prepared as an informational guide for local government professionals. Confirm statutory requirements, local applicability, and current law with qualified agency counsel.
Published by Legislaide Editorial Team. Workbook-based legislative overview. Sources, review, and corrections policy. Source reference record (JSON).